• 1

    FEASIBILITY STUDY

    Analysis of all the project’s relevant factors including economic, technical, legal, and scheduling considerations-to ascertain the likelihood of completing the project successfully.

  • 2

    SCHEMATIC DESIGN

    The client, contractor, interior designer and architect discuss the requirements of the project (how many rooms, the function of the phases,etc.), testing the fit between the owner’s needs, wants, and budget.

  • 3

    DESIGN DEVELOPMENT

    Collects the results from the schematic design phase and takes them one step further. This phase involves finalizing the design intention, and specifying such items as materials, fixtures, equipments and specialty items. With this information, the project budget and schedule, and all building plans are finalized.

  • 4

    PRE-CONSTRUCTION

    We study the project thoroughly and we engineer it, pursuing the most efficient results. This process allows us to find alternative solutions, and hidden opportunities for economy. The project’s success will often be dependent on this phase before a single nail is driven or brick is laid.

  • 5

    PERMITS

    Construction set of plans submission, and reviewing process by building officials, and municipalities to ensure that the project plans complies with local legal standards.

  • 6

    Constructions Phase

    Besides building, scheduling, staying on -time or on- budget, as presumed in any basic construction services, during this phase we provide an elevated construction management experience by maximizing value, productivity, and minimizing issues, while being at all times sensible to design and paying extreme attention to details.

  • 7

    POST CONSTRUCTION

    This is the moment when the project gets turn-over to the client, so they can transition to occupancy or operations.